It is essential that the grounding of cable tray systems, including the cables in the tray systems, is inspected for compliance with the grounding requirements in the National Electrical Code® (NEC®) BEFORE the cabling in the tray is energized and BEFORE cable is installed. If cable is installed, then it is possible to energize the cable before a grounding inspection. It is also easier to complete the cable tray grounding inspection if the tray system does not have cable installed
Published Date: September 19, 2025
Number of pages: 4
Staff Contact: David Richmond